Key Points
LUCKNOW Eleven firms have submitted bids to conduct the geotechnical soil investigation for the 11.65-km-long second phase (1B) of Lucknow Metro, which aims to connect Charbagh and Vasantkunj..
But this crucial step will help gather essential data about the subsoil conditions to assist in the preparation of detailed designs for structures such as viaducts, stations, and underground sections, said officials.o)..
The investigation will provide important insights into soil properties, groundwater levels, and other factors that may impact the design and construction of the metro line..
A highly placed official of Lucknow Metro said once approved, Phase 1B will significantly enhance Lucknows metro network, improving connectivity between key areas of Old City, which are densely populated, and this line will help in easing congestion..
The official said the Charbagh-Vasantkunj line will serve as an important addition to the existing metro infrastructure, contributing to better public transportation options and reducing traffic-related pollution..